I audited the existing installation, available power, possible cable routes and operating constraints for corporate and private-site charging projects.
Site findings and requirements feed the technical study. The parking shown is a teaching model.
MobilityPlus / Study & costing
I contributed to studies, dimensioning and costing, comparing technical and economic options with the stakeholders.
A clear technical file: installation assumptions, interfaces and choices to validate.
MobilityPlus / Deployment
I coordinated installers, clarified responsibilities, prepared interventions and followed progress, deadlines and deviations.
Project follow-up and reporting with Odoo and Excel, connected to the work on site.
MobilityPlus / Acceptance
I organised pre-acceptance actions, tracked reservations and their resolution, and prepared commissioning and useful handover information.
The scenes illustrate the method with simplified geometry, not a real-site plan. My contribution is study, preparation and coordination, not the installation or construction of every object shown.